Stockton Decking Free visit

Decking replacement, Stockton

Many Stockton gardens have a softwood deck from years ago that's now tired. Ask the professionals who quote about replacing it with something better, or re-boarding the frame if it's still sound.

The quick answer

Ask about replacing decks that are past their best rather than patching them. If the joists and posts are sound, ask about new composite or hardwood boards to the existing frame. If they're soft or badly built, ask about taking everything out and rebuilding. Ask the professionals who quote to check by lifting a board during the free visit.

Get free quotes

Replacing an old deck?

  • A proper look at doors, levels and drainage
  • Composite or real timber, priced side by side
  • Yarm, Eaglescliffe, Ingleby Barwick and Norton
Get free quotes
Example image: replacement composite deck where an old timber deck used to be

Recognising a worn-out deck

You'll probably know already. Boards are soft or springy in places, the surface stays green all winter, screws have worked loose or the deck has sunk at one corner. Sometimes the boards look fine but the frame underneath is resting on soil and rotting. When you get your quote, ask about lifting a board to check.

Example image: old softwood deck with cupped boards and one board lifted to show a rotten joist end

Two routes

Re-board. When the frame is solid and level, putting new boards on it is the most economical option. For composite,ask about adding extra joists, because composite needs closer support than the timber boards it's replacing.

Rebuild. When joists are soft, posts are rotten or the deck was built in the wrong place, we strip it out and build again. It's also the chance to change the shape, add a level or move the steps.

Clearing and preparing

Old decks often hide surprises: rubble, broken slabs, a sunken patio or a lot of weeds. When you get your quote, ask about clearing it all, checking drainage and making sure the new frame sits on stable ground. The old timber is taken away.

From timber to composite

Many people replacing a deck choose composite the second time round, having had enough of yearly treatment.

Questions we get asked

How long does a replacement take?

It depends on size and whether the frame stays. Re-boarding a small deck can be quick; a full rebuild with steps and guarding takes longer. When you get your quote, ask the professionals who quote to give you a realistic timescale with the quote.

Can the new deck be bigger than the old one?

Yes. Replacement is a good time to rethink the size and shape. It is worth asking the professionals who quote to check whether a larger or higher deck would need planning permission.

Around Stockton-on-Tees

Yarm and Eaglescliffe, Ingleby Barwick, the west end of Stockton, Norton and out to Wynyard.

Get free quotes

Ask us about deck replacement

A short message about the garden and your postcode is enough to start. You can ask the professionals who quote to arrange a visit at a time that suits you.

  1. Send a message. A few words and your postcode.
  2. A visit from a professional who quotes, for a look round and a chat, with no hard sell.
  3. You get a quote. Free, no hard sell.

Your details are used only to reply to your enquiry. Read our privacy notice.

Out with the old deck?

Free quotes, from Yarm to Wynyard.

Get free quotes